설치 보고서
DVIA-M Series
09-24-2020
YIMO ZEISS GEMINI SEM 500 DVIA-MB1000 (P132 / 190614R2) Internal program performance — 2020.09.24
DVIA-M Series
Installation Report
DVIA-MB1000
ZEISS
GEMINI SEM 500
YIMO
NEMO
internal program performance
P132
190614R2
Xi'an Jiaotong University
Xi'an
목차
MB1000 P132 YIMO 190614R2
| Target equipment | ZEISS_GEMINISEM 500 |
|---|---|
| Place of installation | Xi'an Jiaotong University |
| Remark | Good Performance |
| END USER | Xi'an Jiaotong University |
| Operator: Choim, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.09.23 | |
| Date of reporting : 20.09.24 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.09.23 (WED)
Operator: Daeil System, Research engineer Choim, HyoungMun
Place of measurement : zhanjiang
Equipment Model: ZEISS_GEMINISEM 500
측정 조건 및 결과
측정 결과 요약
Test Condition
Transmissibility
| 방향 | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -20 dB | -27 dB | -26 dB |
| X | -27 dB | -35 dB | -35dB |
| Y | -27 dB | -32 dB | -32dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-24-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
ZEISS
GEMINI SEM 500
YIMO
NEMO
internal program performance
P132
190614R2
Xi'an Jiaotong University
Xi'an
관련 케이스 스터디

DVIA-M Series
YIMO ZEISS Sigma 300 DVIA-MB1000 (P256 / 210604R3) Internal program performance — 2021.11.24
11-24-2021자세히

DVIA-M Series
Xi'an Jingke ZEISS GeminiSEM 300 DVIA-MB1000 (210326R6) Installation Report — 2021.11.23
11-23-2021자세히

DVIA-M Series
YIMO ZEISS Crossbeam 550 DVIA-MB1000 (P204 / 201013R2) Internal program performance — 2021.01.19
01-19-2021자세히