설치 보고서
DVIA-M Series
05-20-2019
Ningbo University of Technology JEOL JEM-2100F DVIA-MB1000 Installation Report — SN 190410R2 (2019-05-20)
DVIA-M Series
Installation Report
JEOL
JEM-2100F
TEM
DVIA-MB1000
DVIA-ML1000
Ningbo University of Technology
장비 사진
측정 대상 장비
JEOL JEM-2100F
설치 장소
Ningbo university of technology
Classroom building2 F1 2-101
비고
Good Performance
END USER
Ningbo university of technology
Operator
Choi, Sung Won
설치 일자
19.05.15
보고 일자
19.05.20
출장 일자
17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 2019.05.15 (wednesday),
Operator: Daeil System, Manager Sung Won Choi
Place of measurement : 2-101, Classroom building2 F1, Ningbo university of technology
Equipment Model: JEOL JEM-2100F
측정 조건 및 결과
측정 결과 요약
| Test Condition | VC-Class | ||
|---|---|---|---|
| Z | X | Y | |
| Floor | C | E | F |
| Above Active | G | G | G |
Good omnidirectional performance.
MB1000 내부 프로그램 성능 측정 결과
Z축
X축
Y축
Octave Band Result (BASE: Floor, TOP: Above Active)
Z축
X축
Y축
Reference
일반 진동 기준
참고:
- VC-A/B는 8-80 Hz, VC-C~VC-G는 1-80 Hz 범위의 1/3 옥타브 밴드에서 측정.
- 세부 크기는 마이크로일렉트로닉스 제조에서의 선폭 또는 의료 연구에서의 입자 크기를 의미.
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일05-20-2019
태그
DVIA-M Series
Installation Report
JEOL
JEM-2100F
TEM
DVIA-MB1000
DVIA-ML1000
Ningbo University of Technology
관련 케이스 스터디

DVIA-M Series
FIBERHOME JEOL JSM-IT500 DVIA-MB1000 Installation Report — onsite measurement (SN 190423R1, 2019-12-03)
12-05-2019자세히

DVIA-M Series
YIMOTECH Hitachi HT7800 TEM DVIA-ML1000 Installation Report
07-01-2026자세히

DVIA-M Series
POSCO Global R&D Center JEOL JSM-7001F DVIA-MB1000 (230518R2) Installation Report
05-15-2026자세히