본문으로 바로가기
설치 보고서
DVIA-ULF Series
05-10-2023

BAOWU ALUMINUM TECHNOLOGY CO.,LTD. EVO10 DVIA-U1000 (221012R10) Installation Report — Henan

DVIA-U Series
Installation Report
BAOWU ALUMINUM TECHNOLOGY
EVO10
Henan
DVIA-U1000
221012R10

BAOWU ALUMINUM TECHNOLOGY CO.,LTD.

BAOWU ALUMINUM TECHNOLOGY CO.,LTD.

(U1000_ 221012R10 Set up)

현장 확인 항목

Target equipmentEVO10
Place of installationHENAN
RemarkGood Performance
END USERBAOWU ALUMINUM TECHNOLOGY CO.,LTD.

운영자 및 일정

Operator: Lee, Youngha Date of setup: 23.04.17 Date of reporting: 23.05.10Date of business trip : 17.12.27~17.12.29

개요

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.04.17 (Monday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: HENAN, China

Equipment Model: EVO10

U1000 내부 프로그램 성능 측정 결과

Z축

X축

Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일05-10-2023
태그
DVIA-U Series
Installation Report
BAOWU ALUMINUM TECHNOLOGY
EVO10
Henan
DVIA-U1000
221012R10