설치 보고서
DVIA-ULF Series
09-10-2020
Foshan Fozhixin Zeiss SUPRA 25 DVIA-UB1000 (190916R10 · P10) Remote tuning — Internal program plots — 2020.09.10
DVIA-ULF Series
Installation Report
DVIA-UB1000
190916R10
P10
Zeiss
SUPRA 25
Foshan
YIMO
Fozhixin
목차
(UB1000_190916R10(P10) Set up)
설치 현장 사진
| Target equipment | Zeiss SUPRA 25 |
|---|---|
| Place of installation | Foshan |
| Remark | Good Performance |
| END USER | Fozhixin |
| Operator: Munho Noh | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.09.10 | Date of reporting : 20.09.10 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.09.10 (THU),
Operator: Daeil System, Research engineer Munho Noh
Place of measurement : Foshan
Equipment Model: Zeiss SUPRA 25
측정 조건 및 결과
측정 결과 요약
Test Condition Transmissibility
| 방향 | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -10.0 dB | -18.45 dB | -26.96 dB |
| X | -5.78 dB | -17.86 dB | -23.47 dB |
| Y | -0 dB | -16.34 dB | -30.0 dB |
Good omnidirectional performance.
UB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일09-10-2020
태그
DVIA-ULF Series
Installation Report
DVIA-UB1000
190916R10
P10
Zeiss
SUPRA 25
Foshan
YIMO
Fozhixin
관련 케이스 스터디

DVIA-ULF Series
YIMO Thermo Fisher Scientific Helios SEM DVIA-ULF1000 Installation Report
05-13-2026자세히

DVIA-ULF Series
YIMO ZEISS Sigma 360 FE-SEM DVIA-ULF700 Installation Report (retuning after degraded performance)
03-18-2026자세히

DVIA-ULF Series
YIMO ZEISS EVO 10 DVIA-ULF1000 (251104R1) Installation Report
01-21-2026자세히