(UB1000_190923R7(P16) Set up)
현장 확인 항목
| Target equipment | ZEISS EVO10 |
|---|---|
| Place of installation | 高意通讯(深圳)有限公司 6th floor In Shenzhen |
| Remark | Good Performance |
| END USER | 高意通讯(深圳)有限公司 |
운영자 및 일정
| Operator: Kim, Doohyun Date of setup : 20.08.24 Date of reporting : 20.08.24 | Date of business trip : 17.12.27~17.12.29 |
|---|
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.08.24 (MON),
Operator: Daeil System, Manager Doohyun, Kim
Place of measurement : 高意通讯(深圳)有限公司 6th floor In Shenzhen
Equipment Model: ZEISS EVO10
측정 조건 및 결과
측정 결과 요약
| Test Condition | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -6 dB | -13 dB | -18 dB |
| X | -2 dB | -15 dB | -20 dB |
| Y | -0 dB | -15 dB | -20 dB |
Good omnidirectional performance.
UB1000 내부 프로그램 성능 측정 결과
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일08-24-2020
태그
DVIA-U Series
Installation Report
YIMO
ZEISS
EVO10
Shenzhen
UB1000
190923R7
Remote tuning
DVIA-UB1000
P16
관련 케이스 스터디

DVIA-ULF Series
YIMO Hitachi S-4800 UB1000 P24 Remote Tuning Installation Report (210302R1, 2021-08-26)
08-26-2021자세히

DVIA-ULF Series
COPPRO Chengdu ZEISS EVO10 DVIA-UB1000 (220310R1) Installation Report
07-27-2022자세히

DVIA-ULF Series
NSK Guangzhou Zeiss Sigma300 UB1000 P17 Remote Tuning Installation Report (210325R6, 2021-10-13)
10-13-2021자세히