Skip to main content
Installation Report
DVIA-ML Series
06-09-2022

Wenzhou Medical College JEOL F200 TEM DVIA-M3000 re-tuning report

DVIA-ML Series
Installation Report
JEOL
TEM
F200

Wenzhou Medical College

(M3000_ 200916R1 Re-Tuning)

Target equipmentJEOL F200 TEM
Place of installationWENZHOU
RemarkOccurrence of x-axis vibration amplification
END USERWenzhou Medical College
Operator: Young ha, Lee Date of setup: 22.06.09 Date of reporting: 22.06.09Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M3000 active vibration isolation platform has been retuned, but it has not yielded as much performance as desired. Intermittent amplification of the 11Hz band occurs on the X-axis. It is difficult to distinguish whether the vibrations in the 11Hz band are occurring in an active vibration isolator or on the equipment at the top, due to the limitations of remote tuning. Needs to measure if the top plate experiences vibrations in the 11 Hz band in the Active Off state. Measurement date: 2022.06.09 (Thursday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: WENZHOU Equipment Model: JEOL F200 TEM

M3000 internal program performance measurement result

Z axis

X axis

Amplification occurs in the 11 Hz band on the X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ML Series
Date06-09-2022
Tags
DVIA-ML Series
Installation Report
JEOL
TEM
F200